The new rub rail track was clamped into place using 3 clamps (pictured and purchased at Home Depot). Holes were then drilled in the track and the initial port stern most portion of the track was riveted into place. Once the rivets were in place, the clamps were moved forward to fix the advancing end of the track in place and then the next set of holes drilled and rivets placed. Rivets were spaced about 6 inches apart (rivets were placed closer together at the stern and around the bow curve).
Click image for maximum view
Date: 08/23/14 - 6:00 PM
Added by: wlagarde
Dimensions: 640 x 467 pixels
Filesize: 84.88Kb
Comments: 0
Number of views: 2863
|