The goals of the project were to: 1) Raise the engine two holes by drilling the "green holes", filling the blind holes, and eliminating the use of extra holes drilled in the lower section of the upper engine mount; 2) Plug and repair old unused holes to prevent water infiltration; 3) Replace the brass thru-hull drain tubes to prevent water infiltration and; 4) Refinish the transom surface to achieve a factory quality finish.
Click image for maximum view
Date: 12/22/13 - 6:07 AM
Added by: wlagarde
Dimensions: 545 x 518 pixels
Filesize: 26.95Kb
Comments: 1
Number of views: 2081
|
http://www.whalercentral.com/articles...icle_id=82