Most foam has been removed from forward floor after some delamination was found. Upon foam removal, a hole was found to be repaired from outside in. Still have a small portion aft to remove, wasn't too difficult, just time consuming, about 10 hours in at this point.
Click image for maximum view
Date: 04/13/13 - 4:31 PM
Added by: echo5000
Dimensions: 640 x 480 pixels
Filesize: 82.6Kb
Comments: 0
Number of views: 1834
|