Posted by randolphp on 06/25/15 - 8:42 AM
#1
After the frame and canvas are assembled can the unit be inserted into adjustable rod holders port and starboard and then each corner tied -off on the railings, perhaps tied to other rod holder's clamped onto the rails. Maybe the unit could be placed anywhere on the rails forward or aft utilizing clamp-on rod holders. Could avoid drilling holes in the decks. There are a lot of uses for clamp-on rod holder's.
Posted by Phil T on 06/25/15 - 1:27 PM
#2
The bimini needs to be attached to the gunnels. 4 screws.
There is nothing wrong with adding sliders (2 screws for each side) and having it moveable.